| Gypsum Stack Sinkhole Florida Miller performed drilling, sampling and grouting as part of sinkhole repair project utilizing multiple sonic and hollow stem auger rigs. Download Brief |
||
| Bear Creek Dam Remediation Alabama Miller provided sonic drilling technology and 10-inch casing advancement drilling technology with support crews to drill and install deep extraction wells, rock piezometers, soil piezometers, eductors and inclinometers. Download Brief |
||
| Exploratory Drilling PCS Phosphates FL Miller provided drilling and sampling services for approximately four-hundred (400) soil borings to depths 15 to 100-ft with an average depth of approximately 45-ft.. Download Brief |
||
| Geotechnical Coring & Sampling Texas Miller completed borings to depths ranging from 200-feet to 638-feet below ground surface. Borings were advanced utilizing mud rotary drilling technologies with sampling at required intervals. Download Brief |
||
| Anniston Army Depot The Barber rig was used to advance numerous boreholes in faulted zones to depths of approximately 700-ft at the depot in association with groundwater remediation. Download Brief |
||
| CDM Bethel Valley MGS Miller provided air rotary drilling techniques and support crews for drilling activities that included subsurface drilling and well Installation of fourteen (14) new groundwater monitoring wells as well as drilling and installation of two (2) cored boreholes with geophysical logging, flow meter testing in support of the Bethel Valley Groundwater Engineering Study. Download Brief |
||
| Shoal Creek Drummond Barber Rig
Miller provided dual-rotary drilling services, materials, driller and labor for the Shoal Creek Mine in Oak Grove, Alabama. Download Brief |
||
| Griffin Saluda Dam Remediation Project Miller provided sonic drilling technology and support crews to drill and install deep well installation, rock piezometers, soil piezometers, eductors and inclinometers. Download Brief |
||
| In Situ Grouting Project MDC
Miler supplied labor, supervisory personnel, materials and equipment to perform the in-situ grouting of trenches 5 and 7 along with seven (7) HRE fuel wells located within WAG7. Download Brief |
||
| Nicholson McCook Reservior Project Sonic drilling will consist of advancing two (2) rows of borings at a 15° angle from vertical using 6-inch sonic methods to depths of 2-ft into bedrock. Depth to bedrock will range between 40 to 75-ft. Download Brief |
||
| OHare Airport Miller supplied air rotary drilling techniques and support crews to drill using 10-inch casing advance technologies and install ten (10) 6-inch wells to 35-feet below ground surface with 15-feet of 0.020-inch slotted PVC screen and riser to 2.5-feet above ground surface. Download Brief |
||
| Rizzo Saluda Dam Permanent Instrumentation Miller provided sonic and support crew to drill and install borings for Casagrande Piezometers and inclinometers through Rip Rap, crushed stone, soils and bedrock, conversion of temporary instrumentation to permanent monitoring wells as part of Phase I and Phase II of the prime contract with SCANA. Download Brief |
||
| Shaw RSA 145 146 DPT 12 05 Miller provided direct push technology using a Geo-Probe® DT66 to collect soil samples, collect groundwater samples and install temporary piezometers at RSA-145/146 at approximately 85 borings locations. Download Brief |
||
| STEP Fort Campbell KY Miller performed air rotary drilling, DPT advancement, with full containment throughout Fort Campbell, including the Campbell Army Airfield. Download Brief |
||
| Tetra Tech HydroFrac Miller supplied all labor, supervisory personnel, materials and equipment to perform the plugging and abandonment of Well 1968; ORNL Hydro-Fracture Well P&A Project, Contract 23900-SC-OR037F, Subcontract No. GCNH-OR037F-120103. Download Brief |